Wellbeing Hub @ Ely
Bringing fit for purpose primary care facilities to Ely and Caerau.

Cardiff and Vale University Health Board is building a new integrated Wellbeing Hub at the heart of your community
The new multi-storey building will be joined to the existing Ely and Caerau Hub to create one integrated building. It will enhance all of the services currently on offer in the hub and provide additional health, wellbeing and community-based services including:
• Your GP
• Community Dental Services
• Sexual Health
• Dieticians
• Diabetic Eye Screening Wales clinic
• Community Wound clinic
• District Nurse Treatment room
• Podiatrist (Feet)
• Continence clinic
• Learning Disability services
• Stop Smoking Wales clinic
• Wellbeing Group Rooms
• Community Cafe
• Information and advice centre
• Midwifery and Health Visiting Services
• Speech Language Therapy

Latest News
Keep up-to-date with the progress of the Wellbeing Hub @ Ely by reading our latest newsletter:
The Wellbeing Hub @ Ely is being developed in partnership with the Health Board, Cardiff Council, Afon Elai Partnership and other key local stakeholders, including Cardiff Third Sector Council, and local community groups. This partnership will provide preventative, community, primary and secondary care and encourage co-production, volunteering and social movements for health.
Integration with other local services provides the community with access to high-quality patient care and helps to improve the health and wellbeing of the population of Cardiff West.
The new Wellbeing Hub is being built into Cardiff Council’s existing Ely Community Hub. By being physically connected and sharing the space, it both provides health and community services and a multi-functional service for patients, staff and the local community.
The Wellbeing Hub @ Ely is part of a series of hubs that ensure a person’s chance of leading a healthy life is the same wherever they live and whoever they are.
The Wellbeing Hub @ Ely is the second to be developed as part of a strategic programme that places community at the centre. Our dedication to patient, carer and community experiences will be amplified by working with our partners across the NHS, social care and third sectors.
We are confident the Wellbeing Hubs will support our citizens to live longer, healthier and better-quality lives.

Frequently Asked Questions
General Queries
When will the construction work begin to provide a new integrated health and wellbeing hub?
If you are already a patient of Afon Elai Partnership (Westway Surgery and Lansdowne Surgery), you will automatically be transferred to the new building once it is opened. Your medical records will be transferred electronically without delay and will continue to be accessible at both sites.
Will the extension to the existing Hub affect the Park and play area?
The extension to provide a new wellbeing hub will encroach onto the green space where the existing play area is. As part of the development proposals, a new and improved play area will be provided a short distance away from the current play area.
When will the new play area be built?
Works to provide a new play area will commence at the start of the works, with completion due in the Spring, 2027.
Will I still be able to access the park during the construction works?
A large section of the park will be fenced off to allow the construction of a new park but there will still be some green space available.
Will the footpath through the park remain open during the construction?
Yes, a pedestrian route through the park will be maintained during the construction works to enable access from Cowbridge Road West to Treseder Way.
Development and Regeneration | Cardiff Development and Regeneration
Health and Wellbeing Services
Will we have to re-register once the GP Practice has moved into the new building?
There are two parts to the construction works:
- The construction of a new three storey building which will link to the existing hub, and contain a number of health and wellbeing services, including a new cafe. These works will commence on week commencing 16th November.
- Refurbishment works to the existing hub to provide upgraded facilities, including a new library area, children’s area and activity/meeting rooms. The refurbishment works to the hub will not commence until the summer 2027.
Will all patients of Afon Elai Partnership be able to access GP services at the new hub?
Yes, if you are registered with either Westway or Lansdowne surgery sites, you will have the option to make appointments at the new site. Only patients who are registered, will be able to access the GP services.
What about Lansdowne Surgery site?
This site will continue to operate normally, any appointments or services at this site will not be affected by this change.
What is happening to the current Westway Surgery site, will we still be able to have appointments there?
No services will operate from the Westway building once the move is complete.
Will there be parking available?
Yes – Parking provision has been included within the development.
Will I still be able to see my usual GP?
All staff will remain the same and will continue to cross site work as they do now, it’s only the Ely site that is moving to a new location.
Will it be easier to get an appointment?
The operational side of the GP Practice will continue to run as usual, the only difference is that Afon Elai Partnership (Westway Surgery and Lansdowne Surgery) will be located in a new building.
How will the dentistry services work?
The Community dental service will stay the same, current patients will remain patients and receive services from the new building.
When will the development be completed?
The development is scheduled to be completed in the Autumn 2028 with services moving into the new hub soon after completion.
What services will be available at the new centre?
- GP Surgery
- Abdominal Aortic Aneurysm (AAA) screening programme
- Acute Child Health – Learning Disability Team (SBU) · Adult Mental Health (Community Mental Health Team)
- Community Child Health Services
- Community Dental Service (CDS)
- Continence (incl. Enuresis)
- Diabetic Eye Screening Wales (DESW)
- Dietetics
- Tissue Viability Service
- District Nursing Team
- Heart Failure Clinic – (Cardiology Clinics)
- Health Visiting clinics/baby clinic/school nursing
- Info/Advice/Signposting · IRIS (Identification & Referral to Improve Safety) within primary health care
- Midwifery
- MSK services
- Podiatry
- Gwasanaeth Cymorth Iechyd Meddwl
- Primary Mental Health Support Service (PMHSS)
- Sexual health clinics (DOSH)
- Stop Smoking Wales clinic
- Community Groups (Information and advice area)
- Podiatry,
- Dietetics,
- Third sector social/activity groups
- Primary Mental Health Support Service
- Falls prevention
Will there be a pharmacy in the new building?
There are no plans to include a pharmacy within the building.
What is the address of the new building?
Cowbridge Road West, Cardiff CF5 5BQ
I am currently registered with Afon Elai Partnership (Westway Surgery and Lansdowne Surgery), but worried about how I will be able to get to the new development as I don't drive?
How do I register with an alternative provider if I choose to?
You can contact the practice of your choice directly and request to register with them. Providing your address falls within that practice boundary area, they will then be able to support you through the registration process. Should you require any further information please contact the Primary Care Team at Cav.Primarycare@wales.nhs.uk
Meddygfeydd Teulu – Bwrdd Iechyd Prifysgol Caerdydd a’r Fro
Hub Services
When will the refurbishment work to the Hub begin?
Work on the external part of the Hub, including the community room area adjacent to the park, is due to begin in Week commencing 16th November 2026. The main refurbishment of the Hub is currently scheduled to start in August 2027, however these dates are indicative and may change as the project progresses.
Will Cardiff Council Hub services still be available during the redevelopment?
Yes, residents will still be able to access Hub services throughout the redevelopment. While there will be some changes to the use of the community room from the end of October 2026, we will aim to keep disruption to a minimum and maintain access to support and services.
We will provide regular updates throughout the project and make sure information about any changes is clear and shared as early as possible.
Will parking and access to the building be affected?
We will aim to maintain safe access to the building throughout the redevelopment. If there are any temporary changes to access arrangements, parking or pedestrian routes, these will be clearly signposted and communicated in advance.
Will the library remain open during the works?
Yes, library services will to be available throughout the redevelopment.
Can I still return library books?
Yes. You will still be able to return library books at the Hub during the redevelopment.
Will I still be able to access money advice, employment support and council tenant services?
Yes, these services will continue to be available throughout the redevelopment. We are committed to maintaining access to these services and will communicate any changes to locations or arrangements in advance.
Will local community groups still be able to meet at the Hub?
Yes, we want community groups to continue meeting and using the Hub throughout the redevelopment. Alternative rooms and spaces will be made available wherever possible, and if any changes are needed, we will work closely with groups to keep them informed and give plenty of notice.
What alternative venues will be available during the works?
We are currently identifying and confirming alternative venues. Further information will be shared as soon as these arrangements are finalised.
Will digital support, access to computer and printing still be available?
Yes, digital support services will continue throughout the redevelopment. Access to computers and printing may be reduced during some stages of the work, but any changes will be communicated in advance.
Will any services have to close temporarily?
No, we will make every effort to keep services running throughout the redevelopment. If any temporary service changes or interruptions are necessary, these will be communicated well in advance.
What measures are being taken to minimise disruption?
We are committed to keeping disruption to a minimum.
We will:
- Communicate any changes as early as possible on social media and in the hub.
- Provide alternative arrangements where available.
- Prioritise access to essential services.
- Continue supporting residents throughout the redevelopment.
Will there be any changes to Hub opening hours?
There are currently no plans to change the Hub’s opening hours.
How can I access emergency housing support during the redevelopment?
Emergency housing support will continue at the Hub throughout the redevelopment and will be available through the usual appointment-based arrangements.
Can community organisations still book meeting space?
Yes. Community organisations will be able to book alternative meeting spaces where these are available. Information about venues and booking arrangements will be shared in advance.
What improvements will the new Hub provide?
The redeveloped Hub will bring together a range of services and facilities in a more modern, accessible space, including:
- Better integrated wellbeing and support services.
- An improved café area.
- Additional meeting and activity rooms.
- More space for community groups and local activities.
- A modernised library environment.
Where can I provide feedback or ask questions about this work?
Engaging and talking to our community as we develop the new Hub is a key part of our process. We want to have an open dialogue with everyone who is interested in the project and ensure that people can influence and improve what we’re doing.
If you have any questions about the project, get in touch with the team using this form.
